Project record · 30 months

From parcel to
primary residence.

Atrium documents every phase as a field record. Drawings, photographs, and field notes are filed and accessible to the principals throughout.

Phase 00 · Mar 2024
Site acquisition

1.8 ha southern chaparral slope. Existing topology mapped with LiDAR.

Phase 01 · Sep 2024
Design development

Studio Werte produces a 240-page record-drawing set. Structural review by Magnusson.

Phase 02 · Apr 2025
Permits + ground-break

Coastal commission approval. Foundation pour staged across three weekends.

Phase 03 · Jan 2026
Envelope close-in

Structural steel topped. Bronze + limestone facade begins to land.

Phase 04 · Sep 2026
Substantial completion

First residents take occupancy. Punch list closed within 30 days.